Tears on my pillar


Carl writes…

Fortunately the broken section of transom rail was with the kiosk when ‘Kelly the Crane’ brought it over [from Derbyshire] to Norfolk. It was the missing piece of the jigsaw & fit perfectly; however it had to be thoroughly stripped of paint & rust before I could could ‘operate’!
After buzzing a ’36’ pad over the broken section & grinding a ‘V’ in both this & the structural transom rail I was ready to re-align. In order to aid perfect alignment of the section when welding, I drilled a hole through the broken section & the corner pillar. The broken section’s hole was enlarged & countersunk. The hole in the corner pillar’s top was threaded with a 5/16 Whitworth ‘taper tap’. A countersunk steel screw was nipped tight between the sections prior to welding. This screw will remain in situ & be coated with body filler creating the correct aesthetics.
After welding, the ’36’ pad was used to ‘dress’ the weld; this ensures the weld trail is flush to the surrounding surfaces.

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: