Day 7 of phase 2. Today Jeff went out hunting and managed to capture an air-conditioning unit. Meanwhile back on-site, Artis took time out from his heavy schedule of banana-drawing (see photo) to construct some lighting boxes. And the lights are going to be fantastic. There will be eight downlighters in the control room – four built into the baffle above the monitors, and four across the centre of the room. There will be a dimmer switch in each room, and each light is built into its own cube-shaped box, ensuring that the bulbs don’t touch the rockwool, and allowing hot air to escape safely into the ceiling void. The light fittings are moveable so each 35W lamp can be angled as needed.

Both interior doors are now fitted. They’re pretty dense as they are, but the guys will be adding an MDF layer to the lobby side of each door to add density (the door and its hinges being potentially the weakest point in the room in acoustic isolation terms). The art and craftsmanship of pro door-hanging is truly a thing to behold. There’s a perfect coin gap all the way down – a £1 fits snugly and a 50p rattles around. This is a pretty phenomenal achievement when you think about it – fitting a 40KG 2m high door within less than 1mm tolerance. I once tried to hang a bathroom door at my previous house. I did such a bad job that I had to move house to avoid the embarrassment…
On the music front, we’ve temporarily stopped listening to Skyforger and have now moved on to Jackyl – AC/DC blues with live chainsaw solos. Oh yes!



1 comment