Ceiling now raised by 9 inches. Concrete block going in all the way around. We’re going to keep the whole of the roof (minus the dry rot!). The lintel has also now gone in, above the control room window. There’ll be a row of blocks above this, and the roof timbers will be fixed to the top of the blocks.